About the Project
Mississagua Street between Mary Street and Queen Street will undergo a full roadway reconstruction, including a new road base and asphalt, upgraded decorative street lighting, a new sidewalk on the west side of the street, and utility relocations as required.
Project Summary:
Overall Road Cross Section: The heritage look and feel will be maintained through the use of swales and ditches.
Infrastructure Improvements – Water: The existing water main will be extended from Johnson Street to Queen Street.
Infrastructure Improvements – Sanitary: The sanitary sewer between Mary Street and Gage Street will be replaced.
Infrastructure Improvements – Storm: A new storm sewer will be constructed to accommodate stormwater runoff throughout the corridor.
Active Transportation Improvements – Pedestrians: A new sidewalk will be constructed on the west side of the street.
Active Transportation Improvements – Cyclists: Dedicated bike lanes with painted buffers.
Vehicular Traffic: Two travel lanes for vehicles, with left and right turning lanes at Mary Street.
Streetlight Enhancements: Installation of decorative post-top streetlights and fixtures.
Construction Timeline
Preliminary construction activities began on November 9, 2026, consistent with the anticipated Fall 2026 construction start.
Construction activities are weather-dependent and may continue through portions of the winter where conditions permit. Some activities are expected to pause between January and March 2027.
The anticipated project completion remains Spring 2027, subject to weather conditions and construction progress.
The public will be notified of any impacts to vehicular and pedestrian traffic as construction progresses. Properties within the project limits will be notified in advance of construction activities that may affect access.