Project Description
Location: Andres Street - Cherry Street to Line 2 Road
Date: Summer/Fall 2023
The work is to consist of, but not limited to, as follows:
- Design and installation of a new minimum 1.5m wide sidewalk along one side of Andres Street to improve walkability in the neighbourhood and provide for connectivity to other sidewalks in the area.